Site Readiness
Review shed, foundations, access, storage, utility and erection readiness before major equipment installation.
Installation succeeds when machinery, civil work, electrical systems, utilities, access, safety and commissioning responsibilities are coordinated as one execution sequence.

Review shed, foundations, access, storage, utility and erection readiness before major equipment installation.
Support equipment positioning, alignment, conveyors, ducting, supports and mechanical package integration.
Coordinate motors, panels, cable routes, controls, earthing and equipment electrical interfaces.
Track the utilities required by the process and the boundaries between machine suppliers and site contractors.
Record incomplete items, deviations and dependencies before trial production begins.
Prepare material, manpower, safety checks, no-load tests and performance-trial conditions.
Confirm drawings, foundations, access, power and installation prerequisites.
Coordinate mechanical equipment, structures, conveying, electrical and controls.
Close punch points and verify safety, rotation, interlocks and no-load readiness.
Support controlled material trials, issue logging and readiness for stable operation.
Share the machinery list, current site status and installation stage for a structured readiness review.